ID: 147 - Veale Residence
Images
Waiting for the electrician
Spring and occupancy
Slowly cleaning up inside
protecting the bales
Waiting for the electrician
Spring and occupancy
Slowly cleaning up inside
protecting the bales
Owner(s): Cameron Veale
Region: Perth
Municipality: Rideau Lakes
Email: info@straworks.ca
Web site: http://www.straworks.ca
Number of bedrooms: 2
Number of bathrooms: 1
Usable floor area, square feet (interior): 1000
Building footprint, square feet: 1200
Number of stories: 1
Occupancy date: Spring 2013
Cost per square foot and what that includes: apprx $175 per square foot. still haven't finally crunched the numbers and finished the floor.
Region: Perth
Municipality: Rideau Lakes
Email: info@straworks.ca
Web site: http://www.straworks.ca
Number of bedrooms: 2
Number of bathrooms: 1
Usable floor area, square feet (interior): 1000
Building footprint, square feet: 1200
Number of stories: 1
Occupancy date: Spring 2013
Cost per square foot and what that includes: apprx $175 per square foot. still haven't finally crunched the numbers and finished the floor.
Builder arrangement: Contractor
Main contractor name: Deirdre McGahern
Main contractor company: Straworks Inc
Straw bale wall system subcontractor name: Deirdre McGahern
Straw bale wall system subcontractor company: Straworks Inc
Plaster subcontractor name: Deirdre McGahern
Plaster subcontractor company: Straworks Inc
Designer's name: Deirdre McGahern
Designer's firm: Straworks Inc
Structural engineer's name: Anthony Spick
Structural engineer's firm: Blackwell Bowick Inc.
Length of time to build (start to occupancy): 14 months
Volunteer participation: No
Ease of obtaining a building permit: Difficult
Main contractor name: Deirdre McGahern
Main contractor company: Straworks Inc
Straw bale wall system subcontractor name: Deirdre McGahern
Straw bale wall system subcontractor company: Straworks Inc
Plaster subcontractor name: Deirdre McGahern
Plaster subcontractor company: Straworks Inc
Designer's name: Deirdre McGahern
Designer's firm: Straworks Inc
Structural engineer's name: Anthony Spick
Structural engineer's firm: Blackwell Bowick Inc.
Length of time to build (start to occupancy): 14 months
Volunteer participation: No
Ease of obtaining a building permit: Difficult
Straw type: Wheat
Other plasters used: Clay with Exterior Siding
Mechanical systems info: HRV as required by building code. Propane hot water
Electrical systems info: 1 KW offgrid system to start
Other green features: Passive solar
Anything else you'd like to share?: Interesting process. Only burnt a cord of wood last winter while working in the house. Passive solar aspect works much better than expected.
This listing has been viewed 647 times. Admin use only: [edit listing]