ID: 14 - Coboconk
Region: Kawartha Lakes/Haliburton Highlands
Municipality: Coboconk
Number of bedrooms: 2
Usable floor area, square feet (interior): 971
Number of stories: 1
Occupancy date: 2004
Municipality: Coboconk
Number of bedrooms: 2
Usable floor area, square feet (interior): 971
Number of stories: 1
Occupancy date: 2004
Main contractor name: Jim Gleason
Straw bale wall system subcontractor name: Camel's Back Construction
Straw bale wall system subcontractor company: Camel's Back Construction
Designer's name: Dale Brownson
Structural engineer's name: Rick Ksander
Length of time to build (start to occupancy): 5 rainy months
Ease of obtaining a building permit: Difficult
Straw bale wall system subcontractor name: Camel's Back Construction
Straw bale wall system subcontractor company: Camel's Back Construction
Designer's name: Dale Brownson
Structural engineer's name: Rick Ksander
Length of time to build (start to occupancy): 5 rainy months
Ease of obtaining a building permit: Difficult
Paints used on bale wall plaster: Eco-house
Mechanical systems info: LPG Boiler, wood stove, EcoFlow sewage collection
Electrical systems info: grid
Anything else you'd like to share?: Permit difficult to obtain, based on small lot size and road allowance, not on straw bale Low E Argon, wood/vinyl windows Drilled well
This listing has been viewed 946 times. Admin use only: [edit listing]